Real time prelocalisation of electrical defaults on high voltage underground cable (single-phase case)

FREE-DOWNLOAD T Aloui, FB Amar, N Derbel… – Proc. Conference WSEAS …, 2010 –
Abstract: – This paper proposes an assistance tool to the prelocalisation of the insulation defaults
affecting electrical single-phase cables by using voltage and current measurements available
in source substation. An equivalent network modeling defaults to the ground is analyzed 