Analysis of Rework and Rescheduling in Construction Project using SPSS Software



Rework is a primary contributor to time wastage and time table overruns which eventually impact on cost, assets and quality. Rework is additionally affecting the mission performance. So minimizing the transform is important one. The goal of the questionnaire survey is to analyze the motives and have an impact on of rework. Questionnaire survey has been carried out among a variety of construction corporations and contractors in Salem District. The questionnaire prepared based totally on motives and influence of rework. Ranking analysis is completed by means of the use of the SPSS Statistical Package for the Social Sciences .In this analysis it helps to check the stability and consistency of information accumulated from the questionnaire survey. Finding the foremost reasons rescheduling will be done.

by P. Haritha | Dr. K. Vidhya “”Analysis of Rework and Rescheduling in Construction Project using SPSS Software””

Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-4 | Issue-4 , June 2020,

URL: https://www.ijtsrd.com/papers/ijtsrd30930.pdf

Paper Url :https://www.ijtsrd.com/engineering/civil-engineering/30930/analysis-of-rework-and-rescheduling-in-construction-project-using-spss-software/p-haritha

callforpaperarts, artsjournal, peerreviewedjournal