Analysis of Three Phase Transformer Parallel Operation and Circulating Current ijtsrd
Parallel operation of transformers is needed when the load is increased and it exceeds the capacity of the existing transformer, if multiple transformers are running in parallel and a fault occurs in one transformer, then the other parallel transformers still continue to serve the load. The reliability is increased with parallel operation than to have […]
Mixed Bonding Method of High Voltage Cable IJTSRD
In three single phase high voltage underground cable induce voltages and currents in their sheaths. The sheath induced currents are undesirable and generate power losses and reduce the cable ampacity whereas the induced voltages can generate electric shocks to the workers that keep the power line. This means that when dealing with three single phase […]